Risk Colour | Risk rating | Risk level | Identifier | Action required |
---|---|---|---|---|
GREEN | 0-4 | Low | Control measures in place or risk of harm is insignificant | Long term action with routine review |
AMBER | 5-12 | Medium | Likelihood of major harm if control measures not implemented | Action is needed in the medium term |
RED | 15-25 | High | Significant probability of major harm | Urgent action needed. Escalate to line manager, patient's GP and senior manager. |